Back to all articles
Best Practices

Industrial drilling: High capacity solutions for companies and large projects

Industrial drilling involves strict technical requirements, high flow rates and complex documentation. Complete guide for project managers and engineers.

Team ForajePuțuri.ro

Author

March 30, 2025
13 min read
Industrial drilling: High capacity solutions for companies and large projects

What are industrial drilling?

Industrial boreholes are underground water capture works sized for large flows (10–1,000 m3/day) and used for commercial, agricultural or production purposes. They differ from domestic drilling by the technical complexity, strict regulation and extensive documentation required by law.

Image in article

Main applications of industrial drilling

🏭 Industry and production

  • Cooling industrial installations (factories, thermal plants)
  • Technological processes (food, pharmaceutical, chemical)
  • Equipment washing and industrial cleaning
  • Fire water and safety reserves

🌾 Agriculture and animal husbandry

  • Irrigation systems for agricultural areas (10–500 ha)
  • Animal watering in large farms
  • Greenhouses and solariums with automated irrigation

🏨 Tourism and HoReCa

  • Hotels and tourist complexes
  • Swimming pools and water parks
  • Camps and holiday villages

♨️ Geothermal energy on a large scale

Industrial boreholes are the basis of heat pumps systems for office buildings, residential complexes and industrial halls. The need for wells can reach 20–50 wells for large projects.

Technical differences from domestic drilling

ParameterDomestic drillingIndustrial drilling
Flow rate0.5–5 mc/h5–200 mc/h
Diameter125–160 mm200–600 mm
Depth20–100 m50–500+ m
Execution time1–5 days2–8 weeks
EquipmentMedium EquipmentLarge Rotary Rigs, DTH
DocumentationSimplifiedHydrogeological study, AGM, authorizations
Test pumpingSeveral hours72–240 hours (flow test)

Mandatory documentation for industrial drilling

Unlike domestic drilling, industrial drilling involves a complex file. Full details in the guide on wells legislation.

  • Hydrogeological study — technical document that estimates available flow and water quality
  • Water Management Notice (AGM) — mandatory, issued by the Water Basin Administration
  • Construction permit — if it involves outbuildings
  • Environmental authorization — for projects with significant impact
  • DSP notice — mandatory if the water is used in the food industry
  • ANAR registration and payment of the royalty for water abstraction

Test pumping — industry standards

The pumping test for industrial wells is much more rigorous than for domestic wells:

  • Duration: Minimum 72 hours (recommended 7 days for aquifers with complex behavior)
  • Stages: Gradual pumping (step test) + constant flow pumping + regeneration
  • Monitoring: Dynamic level, flow, conductivity, water temperature
  • Analyses: Water samples at regular intervals throughout the test
  • Final report: Pumping curves, transmissivity calculation, recommended sustainable flow rate

Industrial drilling costs 2025

WorkIndicative cost
Hydrogeological study5,000–20,000 lei
Industrial drilling (200–300 mm, 100 m)80,000–150,000 lei
Stainless steel tubing20,000–50,000 lei
Test pumping (72 hours) + report8,000–20,000 lei
Complete pumping station30,000–100,000 lei
Obtaining approvals (AGM, DSP)3,000–10,000 lei

Maintenance of an industrial drilling

Industrial drilling requires stricter maintenance schedules:

  • Continuous monitoring — permanently installed flow and level sensors
  • Quarterly analyses — for food or pharmaceutical processes
  • Annual or biennial denisipation — for wells with high flow rate; details in the professional denisipari
  • guide
  • Annual video inspection for deep wells (200+ m)
  • Periodic pumping test — every 5 years to check parameters

How to choose a company for an industrial drilling

The criteria are stricter than for domestic drilling. In addition to the general guide to choosing the drilling company, check:

  • ✅ ANAR authorization for the execution of industrial drilling
  • ✅ Demonstrated experience in similar projects (request references)
  • ✅ Own hydrogeology and design capacity
  • ✅ Adequate machinery (300+ kW rotary plants for deep depths)
  • ✅ Professional civil liability insurance minimum EUR 500,000
  • ✅ Possibility of long-term service and maintenance
Do you have an industrial or commercial project that requires groundwater?
We carry out hydrogeological studies, industrial drilling and complete documentation. Contact us for a project evaluation.
→ Industrial drilling — let's discuss your project

Conclusion

Industrial drilling is a complex project that requires rigorous planning, complete documentation and a company with proven experience. The investment is significant, but an own source of groundwater reduces dependence on the public network and can bring major savings in the long term. Avoid the costly mistakes outlined in our guide to common drilling mistakes and make sure your documentation is complete before you start work.

Tags:

industrial drillingindustrial water catchmenthigh flowshydrogeological studyAGM